消息
×
loading..
x

Main Product FRP GRP Water Storage Tank Lower Price

US$150.00 - 200.00 10 cube meter (MOQ)
Port:
Qingdao, China
Production Capacity:
3000 Set/Month
Payment Terms:
T/T

Last Login Date:

May 30, 2025

Business Type:

Manufacturer/Factory, Trading Company

Main Products:

Water Tank, Fan Coil, Fans, Cooling Tower

Find Similar Products

Product Description

Company Info

Basic Info.

Certification
ISO9001, CE
Wall Thickness
4mm-14mm
Installation
Sitting Type
Material
Type
SMC Water Tank
Water Quality
in Line with GB5740
Service Life
More Than 20 Years
Quality Gurantee
Color
Silver
Condition
Trademark
AIKE
Transport Package
Plate Package
Specification
1000*1000m, 1000*500m, 500*500m
Origin
China

Product Description

Product description
1. Product Description of the Fiberglass water tank
SMC water tank is also called SMC storage tank, FRP/GRP water tank, SMC panel tanks. It is a new type of tank. It is made of high qualified SMC panels. Sheet molding compound (SMC) is a kind of fiberglass reinforced plastic, which is a mixture of unsaturated polyester resin with impregnating augmentation material, filling material and glass fiber. SMC water tank is nontoxic, durable, lightweight, corrosion resistant and good-looking. Meanwhile, it's easy to maintain and long-life. It is widely used in water storage in residential buildings, schools, hotel. SMC water tanks are used both for domestic water as well as medicine and health where needs good water supply quality.
Main parameter
ProjectPerformance Index
Tensile strength(Mpa)≥60
Bending strength(Mpa)≥100
Bending modulus(Gpa)≥7.0
Pap hardness≥60
Bibulous rate(%)≥60
Fiberglass content≥25
Maximum distortion of side wall≤0.5%

2.Structure
AIKE fatory workshop
3.FRP Water tank installation from Aike

Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align glass reinforced plastic panels to be pre assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.
Application
Contact Us



 
Send your message to this supplier
Mr. Aike Group

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes