Stainless Steel Panel Water Storage Tank
1. Product Description of the Stainless steel water tank
Stainless steel water tanks are made from hot pressed moulded panels. To ensure good quality, we choose to use high quality SUS304,SUS316 as raw material. Stainless steel panels are shaped by hydraulic press mold. Panels and accessories are welded at site by arc-argon welding machine. The welding surface is washed and passivated by acid to ensure the welding parts will not get rusted.
2.Structure
3.Stainless Steel Water tank installation from Aike
Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align glass reinforced plastic panels to be pre assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.
4.Accessories
5.Packaging&Delivery
Packing:packed in case(Non fumigation wooden box) and suitable for shipping by sea.
Delivery:7 days after receiving advanced payment.
6.Certificate&Service
7.FAQ
1.Are you factory or trade company?
We are manufacture.
2.What's the guarantee, in case the water tank breaks down?
The water tank has one year s guarantee. If it breaks down, generally speaking, our
technician will figure out what the problem may be, according to clients feedback.
Parts will be replaced for free if the problems are caused by quality fault.
3.How about the documents after shipment?
After shipment, we will send all original documents to you by DHL, including Packing
List, Commercial Invoice, B/L, and other certificates as required .
4.How long is the delivery time?
For standard water tank less than 100m3, it would be 7-10 days; For non standard
water tank and customized water tank according to client s specific requirements, it
would be 15 to 30 days.
5.How's the payment?
Telegraphic Transfer(T/T). L/C at sight .
6.Do You Arrange Shipment For The Machines?
Yes, dear esteemed customers, for FOB or CIF price, we will arrange shipment for
you. For EXW price, clients need to arrange shipment by themselves or their
agents.
7.How is the packing?
Solid Seaworthy plywood Box Package with Steel Belt Save space as much as possible for container loading.
Cautions
1. Please do not store water higher than 60°C or other liquid (chemicals, oil and so on).
2. Keep away from fire.
3. Prevent pollutants and plunges from outside.
4. Use soft apparatus to clean. As to the new water tank, clean twice before use .